Load split

>

Load split

Function that allows the power available on a charging station to be split in two if the station has two charge points. For example, a charging station with two charge points produces a maximum of 22kW: if one car is charging, it can charge at 22kW, but if two cars are charging at the same time, they will each have only 11kW.